Safe walkways and associated drainage works

Ferme Park, London

New carriage wash installation and associated drainage works

Caledonian Road, Perth

  • Installation of ground lights
  • Tanking water distribution system
  • CET system installation.
  • New DNO electrical supply
  • New GRP Walkway

Turn key design and building contract to provide a new enclosed carriage wash facility. Pollution containment was required for the wash water run off. The new Unipart Rail & Cairn Cross Solutions TrackPan with safe walking access were utilised.

 

  • New building to house new carriage wash
  • New carriage wash plant room
  • Installation of troughing and walking routes
  • Installation of TrackPans
  • New drainage connections
  • Innovation: Use of the new Cairn Cross TrackPan system.

Entrance Scheme and associated drainage

Longsight, Manchester

Sidings redevelopment and associated drainage works

Polmadie, Glasgow

A new security building and car park facility was required at the entrance to the existing maintenance depot.

 

  • Water attenuation system installation
  • Car park capping
  • Laying of half batten kerbing
  • Landscaping - Removal of top soil
  • Car park drainage
  • Concrete foundations and slab to security office

The intention of the redevelopment of the sidings at Polmadie depot was to provide a potable tanking facility along with CET discharge facilities and refurbished welfare buildings. This would vastly increase the efficiency and use of an otherwise rundown area.

 

  • Reinforced concrete footpaths
  • Service channels cast into concrete to enable the distribution of walkway lighting cables
  • Replacement of wooden sleepers for concrete sleepers to provide a great life expectancy of the permanent way
  • Lighting designed to give maximum light on a confined walkway
  • A concrete troughing route was cast into the path for the installation of the lighting bollards, using energy efficient LED bulbs
  • Taking water was distributed along the fence line and race heated and lagged, the pipe work was then taken across onto the footpath by UTX and tanking points