Mechanical and Electrical Installations

Design and build contract for power distribution, installation of fire alarm, oil distribution system and depot protection

Queens Road, Manchester

Design and build contract for the installation of walkway lighting, CET and water systems

Ferme Park, London

  • Overhead monorail crane
  • Installation of depot protection system
  • Low voltage power distribution and lighting
  • Installation of compressed air system
  • Installation of oil distribution system
  • Installation of radiant heating system and associated gas pipe work
  • Installation of ground lights
  • Tanking water distribution system
  • CET system installation.
  • New DNO electrical supply
  • New GRP Walkway

Telecommunications system, track side and high mast lighting

Castle Donington, East Midlands

Installation of a new single headed wheel lathe

Craigentinny, Edinburgh

A new rail freight terminal was required to service the new Marks and Spencer distribution centre at Castle Donington incorporating approximately 3.5 kilometre of permanent way.

 

  • Buffer Stops
  • BV8 Turnouts
  • Safe Cess Walkways
  • Bollard Lighting
  • Lighting Columns
  • Telephone Systems

 

Turn key design and building contract to replace a single headed wheel lathe with a new single headed Hegenscheidt CNC wheel lathe requiring actuations to existing structure.

 

  • Installation of Endurance Luminaire pit lights
  • Connection of electrical services to the new wheel lathe
  • Design and installation of associated mechanical and electrical work
  • Removal and isolation of existing machinery
  • Demolition of existing pit
  • Construction of a new wheel lathe pit
  • Supply and install a new wheel lathe

 

Design and build contract to replace an existing carriage wash with a new carriage wash plant

Caledonian Road, Perth

RRV crane shed extension and lighting design

Crewe, Cheshire

Turn key design and building contract to provide a new enclosed carriage wash facility. Pollution containment was required for the wash water run off. The new Unipart Rail & Cairn Cross Solutions TrackPan with safe walking access were utilised.

 

  • New building to house new carriage wash
  • New carriage wash plant room
  • Installation of troughing and walking routes
  • Installation of TrackPans
  • New drainage connections
  • Innovation: Use of the new Cairn Cross TrackPan system.
  • Installation of LED lights to both the exterior & interior of the building
  • Installation of a new electrical sub main
  • New electrical containment and small power works
  • Installation of new crane shed
  • New reinforced concrete transition slab
  • New steel frame & concrete foundations
  • New cladding to the superstructure & roof
  • New Roller Shutter Doors & Pedestrian Fire Doors
  • New Local Ventilation Exhaust System Installed
  • New car park & Pedestrian Walkways

Cairn Cross Civil Engineering Limited. All Rights Reserved 2016