Pollution Control

Design and build a new carriage wash

Caledonian Road, Perth

Concrete walkway and track pan installation for fuelling area

Heaton, Newcastle

Turn key design and building contract to provide a new enclosed carriage wash facility. Pollution containment was required for the wash water run off. The Unipart Rail TrackPans with safe walking access were utilised.

 

  • New building to house new carriage wash
  • New carriage wash plant room
  • Installation of troughing and walking routes
  • Installation of TrackPans
  • New drainage connections
  • Innovation: Use of the Unipart Rail TrackPan system

Design, supply and installation of track pans & concrete walkways

 

Design and build a new carriage wash

Holyhead, Anglesey

Refuelling infrastructure works

Crofton, Wakefield

 

Constructed fuel containment bunded structure, concrete service trough, CET and refuelling infrastructure, including drainage, concrete works and track collector pans

 

Innovation: Bespoke trough lids were pre-cast to minimise cost and production time.