Wheel Lathes

Installation of a single headed Wheel Lathe

Toton, Nottingham

 

  • Installation of a new insulated dividing wall
  • Installation of pedestrian access door, fire escape door, a manually operated roller shutter door and a forklift access for was installed on the new dividing wall.
  • Removal of existing machinery
  • Demolition of existing pit
  • Construction of a new wheel lathe pit including de-watering system
  • Installation of new power and distribution to the pit
  • Installation of small power and heating to the pit
  • Installation of the Endurance LED Luminaire
  • Installation of a new jib crane
  • Installation of a new oil sensitive sub-pump

Installation of a double headed Wheel Lathe

Wimbledon, London

 

Turn key design and building contract to replace a single headed wheel lathe with a new Hegenscheidt CNC wheel lathe requiring actuations to existing structure.

 

  • Removal of existing machinery
  • Demolition of existing pit
  • Construction of a new wheel lathe pit
  • Supply and install a new wheel lathe and Swarf Conveyor
  • Installation of new sub mains and distribution
  • Installation of small power
  • Supply and install of crane hoist and beams
  • Gable end cladding works
  • Installation of the Cairn Cross Solutions Endurance Luminaire

Overhaul of the maintenance facility and installation of a replacement Wheel Lathe Pit

Stoke, England

 

  • Overhaul of maintenance facility and installation of wheel lathe pit
  • New in situ concrete floors
  • Various pits and foundations to suit new machinery
  • Construction of a new concrete access spanning 7 roads
  • Installation of new insulated roller shutter doors
  • Complete overhaul of existing electrical system

Installation of a new single headed Wheel Lathe

Craigentinney, Edinburgh

 

Turn key design and building contract to replace a single headed wheel lathe with a new single headed Hegenscheidt CNC wheel lathe requiring actuations to existing structure.

 

  • Removal of existing machinery
  • Demolition of existing pit
  • Construction of a new wheel lathe pit
  • Supply and install a new wheel lathe
  • Associated mechanical and electrical work
  • Use of a MegaLift system to install the Wheel Lathe

Installation of a new double headed Wheel Lathe

Wembley, London

 

Turn key design and build contract to replace a single headed wheel lathe with a double headed Hegenscheidt CNC wheel lathe.

 

  • Removal of existing machinery
  • Demolition of existing pit
  • Construction of a new wheel lathe pit
  • Supply and install a new wheel lathe
  • Associated mechanical and electrical work
  • Extension to existing building framework to accommodate 11 car pendolino trains

Installation of a new single headed Wheel Lathe

Longsight, Manchester

 

Turn key design and build contract to replace a single headed wheel lathe with a new Hegenscheidt CNC under floor wheel lathe.

 

  • Removal of existing machinery
  • Demolition of existing pit
  • Construction of a new wheel lathe pit
  • Supply and install a new wheel lathe
  • Associated mechanical and electrical work
  • Extension to the existing building

Cairn Cross Civil Engineering Limited. All Rights Reserved 2016

Registered in England and Wales 03110217 • VAT 566419417

Wheel Lathes

Installation of a single headed Wheel Lathe

Toton, Nottingham

 

  • Installation of a new insulated dividing wall
  • Installation of pedestrian access door, fire escape door, a manually operated roller shutter door and a forklift access for was installed on the new dividing wall.
  • Removal of existing machinery
  • Demolition of existing pit
  • Construction of a new wheel lathe pit including de-watering system
  • Installation of new power and distribution to the pit
  • Installation of small power and heating to the pit
  • Installation of the Endurance LED Luminaire
  • Installation of a new jib crane
  • Installation of a new oil sensitive sub-pump

Installation of a double headed Wheel Lathe

Wimbledon, London

 

Turn key design and building contract to replace a single headed wheel lathe with a new Hegenscheidt CNC wheel lathe requiring actuations to existing structure.

 

  • Removal of existing machinery
  • Demolition of existing pit
  • Construction of a new wheel lathe pit
  • Supply and install a new wheel lathe and Swarf Conveyor
  • Installation of new sub mains and distribution
  • Installation of small power
  • Supply and install of crane hoist and beams
  • Gable end cladding works
  • Installation of the Cairn Cross Solutions Endurance Luminaire

Overhaul of the maintenance facility and installation of a replacement Wheel Lathe Pit

Stoke, England

 

  • Overhaul of maintenance facility and installation of wheel lathe pit
  • New in situ concrete floors
  • Various pits and foundations to suit new machinery
  • Construction of a new concrete access spanning 7 roads
  • Installation of new insulated roller shutter doors
  • Complete overhaul of existing electrical system

Installation of a new single headed Wheel Lathe

Craigentinney, Edinburgh

 

Turn key design and building contract to replace a single headed wheel lathe with a new single headed Hegenscheidt CNC wheel lathe requiring actuations to existing structure.

 

  • Removal of existing machinery
  • Demolition of existing pit
  • Construction of a new wheel lathe pit
  • Supply and install a new wheel lathe
  • Associated mechanical and electrical work
  • Use of a MegaLift system to install the Wheel Lathe

 

Installation of a new double headed Wheel Lathe

Wembley, London

 

Turn key design and build contract to replace a single headed wheel lathe with a double headed Hegenscheidt CNC wheel lathe.

 

  • Removal of existing machinery
  • Demolition of existing pit
  • Construction of a new wheel lathe pit
  • Supply and install a new wheel lathe
  • Associated mechanical and electrical work
  • Extension to existing building framework to accommodate 11 car pendolino trains

Installation of a new single headed Wheel Lathe

Longsight, Manchester

 

Turn key design and build contract to replace a single headed wheel lathe with a new Hegenscheidt CNC under floor wheel lathe.

 

  • Removal of existing machinery
  • Demolition of existing pit
  • Construction of a new wheel lathe pit
  • Supply and install a new wheel lathe
  • Associated mechanical and electrical work
  • Extension to the existing building